Semiconductors

Broadcom Inc. vs Taiwan Semiconductor Manufacturing Company Ltd.

WatchlistAVGO / TSMPrices through Nov 10, 2026

Why these are rivals: #2 and #3 by market value ($2099B vs $1585B) in Nasdaq's "Semiconductors" industry; SEC SIC 3674 / 3674 (same major group); #2 and #3 by market value ($2099B vs $1585B) with SEC SIC 3674 (Semiconductors & Related Devices).

Rivals, but right now the price gap does not have a measured habit of closing, so there is no paper idea, whatever the gap.

  • Mean reversion: ADF t-statistic of the spread: -1.62 (needs <= -2.873 (5% critical value))
Business leadership

Business size

Annual revenue reported to the SEC. Scale, not market share.

YearAVGOTSMLarger
2025$63.9B--
2024$51.6B--
2023$35.8B--
2022$33.2B--
2021$27.4B--
2020$23.9B--

Market value: AVGO $1.59T, TSM $2.10T.

Stock leadership

TSM is ahead now

Measured against the pair's own last 252 trading days.

TSM leads AVGO by 0.98 standard deviations: +15.0% over its usual price ratio. 1 lead switch in the last year.

Price change3 mo6 mo12 mo
AVGO-20.2%-20.8%-5.0%
TSM-7.6%-0.2%+38.4%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 2534 (needs >= 254)
Pass
Co-movement: daily return correlation, 252 sessions: 0.64 (needs >= 0.60)
Fail
Mean reversion: ADF t-statistic of the spread: -1.62 (needs <= -2.873 (5% critical value))
Pass
Speed: half-life of the spread, sessions: 38.63 (needs <= 63)
Data
Both stocks current
The twins over two years

Prices side by side, and the gap between them

AVGO Broadcom Inc. TSM Taiwan Semiconductor Manufacturing Company Ltd.Price index, 100 = 2024-11-06. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
100200Nov 2024Nov 2025Nov 2026AVGO 185TSM 205
Spread z-score: AVGO relative to TSM, against the 252 sessions before each day. Above 0: AVGO ahead; below 0: TSM ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopNov 2024Nov 2025Nov 2026
Data table (504 sessions)
DateAVGO indexTSM indexzAhead
2026-11-10184.90205.20-0.98TSM ahead
2026-11-09177.93201.13-1.11TSM ahead
2026-11-06163.57194.31-1.47TSM ahead
2026-11-05162.37182.75-1.10TSM ahead
2026-11-04181.28204.82-1.14TSM ahead
2026-11-03184.98209.50-1.16TSM ahead
2026-11-02179.47206.31-1.27TSM ahead
2026-10-30181.61210.19-1.33TSM ahead
2026-10-29192.15223.48-1.37TSM ahead
2026-10-28195.94227.47-1.37TSM ahead
2026-10-27190.66226.10-1.53TSM ahead
2026-10-26183.33219.63-1.61TSM ahead
2026-10-23179.16216.60-1.69TSM ahead
2026-10-22180.03213.41-1.57TSM ahead
2026-10-21188.14223.52-1.60TSM ahead
2026-10-20186.23220.00-1.57TSM ahead
2026-10-19186.35217.48-1.50TSM ahead
2026-10-16183.10213.54-1.51TSM ahead
2026-10-15191.77218.53-1.36TSM ahead
2026-10-14192.84222.54-1.46TSM ahead
2026-10-13199.00230.37-1.49TSM ahead
2026-10-12197.57229.97-1.55TSM ahead
2026-10-09201.36234.61-1.57TSM ahead
2026-10-08200.58237.03-1.69TSM ahead
2026-10-07209.70244.38-1.60TSM ahead
2026-10-06209.31249.61-1.78TSM ahead
2026-10-05201.90251.42-2.12TSM ahead
2026-10-02197.79244.68-2.10TSM ahead
2026-10-01191.39237.66-2.15TSM ahead
2026-09-30195.59236.10-1.97TSM ahead
2026-09-29197.77236.49-1.92TSM ahead
2026-09-28194.69234.39-1.99TSM ahead
2026-09-25196.50233.21-1.90TSM ahead
2026-09-24195.13233.49-1.99TSM ahead
2026-09-23197.71231.12-1.83TSM ahead
2026-09-22203.03233.93-1.74TSM ahead
2026-09-21201.98230.38-1.67TSM ahead
2026-09-18199.17224.96-1.61TSM ahead
2026-09-17193.43222.68-1.76TSM ahead
2026-09-16189.09216.19-1.72TSM ahead
2026-09-15188.96214.13-1.66TSM ahead
2026-09-14191.99216.34-1.63TSM ahead
2026-09-11201.61224.22-1.54TSM ahead
2026-09-10200.96221.52-1.49TSM ahead
2026-09-09202.94225.32-1.55TSM ahead
2026-09-08205.27227.20-1.53TSM ahead
2026-09-04199.33221.98-1.59TSM ahead
2026-09-03198.92215.82-1.41TSM ahead
2026-09-02204.53215.04-1.20TSM ahead
2026-09-01205.89214.26-1.13TSM ahead
2026-08-31206.26214.95-1.15TSM ahead
2026-08-28205.40216.09-1.23TSM ahead
2026-08-27206.93221.15-1.35TSM ahead
2026-08-26198.05216.17-1.51TSM ahead
2026-08-25198.69216.03-1.50TSM ahead
2026-08-24199.81212.26-1.34TSM ahead
2026-08-21205.21216.83-1.31TSM ahead
2026-08-20202.75215.30-1.36TSM ahead
2026-08-19201.88213.28-1.33TSM ahead
2026-08-18211.64213.96-1.03TSM ahead
2026-08-17218.56223.05-1.10TSM ahead
2026-08-14218.87220.66-1.02TSM ahead
2026-08-13232.70222.80-0.66TSM ahead
2026-08-12231.72222.10-0.68TSM ahead
2026-08-11231.73218.43-0.57TSM ahead
2026-08-10235.25216.58-0.40near the usual relationship
2026-08-07238.24217.39-0.35near the usual relationship
2026-08-06234.23216.44-0.44near the usual relationship
2026-08-05232.96214.26-0.41near the usual relationship
2026-08-04232.89215.90-0.47near the usual relationship
2026-08-03218.45210.18-0.74TSM ahead
2026-07-31216.81209.22-0.77TSM ahead
2026-07-30216.01208.73-0.78TSM ahead
2026-07-29206.25193.91-0.60TSM ahead
2026-07-28212.15203.04-0.73TSM ahead
2026-07-27213.43206.55-0.81TSM ahead
2026-07-24212.71208.78-0.91TSM ahead
2026-07-23218.59215.08-0.94TSM ahead
2026-07-22221.00218.00-0.96TSM ahead
2026-07-21215.26219.75-1.21TSM ahead
2026-07-20210.62208.21-1.00TSM ahead
2026-07-17206.53206.17-1.07TSM ahead
2026-07-16208.55212.06-1.21TSM ahead
2026-07-15219.59217.10-1.02TSM ahead
2026-07-14216.71217.57-1.14TSM ahead
2026-07-13213.90218.19-1.26TSM ahead
2026-07-10222.76224.67-1.19TSM ahead
2026-07-09223.40226.15-1.23TSM ahead
2026-07-08216.48226.16-1.46TSM ahead
2026-07-07206.51223.87-1.75TSM ahead
2026-07-06208.24233.82-2.02TSM ahead
2026-07-02200.75224.70-2.03TSM ahead
2026-07-01205.70229.91-2.04TSM ahead
2026-06-30210.39247.16-2.44TSM ahead
2026-06-29207.44235.53-2.22TSM ahead
2026-06-26203.30223.76-2.02TSM ahead
2026-06-25211.03225.13-1.80TSM ahead
2026-06-24212.79228.15-1.86TSM ahead
2026-06-23211.72225.85-1.84TSM ahead
2026-06-22218.40242.04-2.16TSM ahead
2026-06-18229.10239.17-1.72TSM ahead
2026-06-17218.82223.66-1.57TSM ahead
2026-06-16209.81220.39-1.80TSM ahead
2026-06-15219.40228.44-1.75TSM ahead
2026-06-12212.79219.40-1.69TSM ahead
2026-06-11214.74217.92-1.58TSM ahead
2026-06-10207.24211.55-1.64TSM ahead
2026-06-09218.41221.47-1.61TSM ahead
2026-06-08220.89220.89-1.51TSM ahead
2026-06-05214.83214.87-1.52TSM ahead
2026-06-04233.31230.27-1.43TSM ahead
2026-06-03266.91226.01-0.19near the usual relationship
2026-06-02268.21231.18-0.34near the usual relationship
2026-06-01256.18225.46-0.51TSM ahead
2026-05-29248.83216.57-0.43near the usual relationship
2026-05-28237.58219.88-0.93TSM ahead
2026-05-27234.95218.78-0.98TSM ahead
2026-05-26235.04213.39-0.78TSM ahead
2026-05-22230.65209.36-0.79TSM ahead
2026-05-21230.89210.72-0.84TSM ahead
2026-05-20232.67207.86-0.67TSM ahead
2026-05-19228.94203.19-0.62TSM ahead
2026-05-18234.31204.92-0.51TSM ahead
2026-05-15236.81209.27-0.59TSM ahead
2026-05-14244.94216.19-0.59TSM ahead
2026-05-13232.13206.91-0.67TSM ahead
2026-05-12233.53205.61-0.58TSM ahead
2026-05-11238.61209.37-0.55TSM ahead
2026-05-08239.49213.06-0.67TSM ahead
2026-05-07229.77214.34-1.06TSM ahead
2026-05-06236.95217.11-0.92TSM ahead
2026-05-05238.02204.12-0.38near the usual relationship
2026-05-04231.97207.85-0.74TSM ahead
2026-05-01234.63205.81-0.57TSM ahead
2026-04-30232.49204.98-0.62TSM ahead
2026-04-29225.81203.82-0.82TSM ahead
2026-04-28222.68203.05-0.91TSM ahead
2026-04-27232.92209.60-0.80TSM ahead
2026-04-24235.46208.29-0.66TSM ahead
2026-04-23233.88198.04-0.30near the usual relationship
2026-04-22235.39200.52-0.35near the usual relationship
2026-04-21223.99190.50-0.34near the usual relationship
2026-04-20222.57189.55-0.36near the usual relationship
2026-04-17226.42191.75-0.31near the usual relationship
2026-04-16221.93188.05-0.32near the usual relationship
2026-04-15220.95194.13-0.62TSM ahead
2026-04-14212.07196.61-1.07TSM ahead
2026-04-13211.50191.27-0.87TSM ahead
2026-04-10206.93191.80-1.08TSM ahead
2026-04-09197.67189.16-1.35TSM ahead
2026-04-08195.28189.37-1.46TSM ahead
2026-04-07186.00178.72-1.39TSM ahead
2026-04-06175.12176.88-1.81TSM ahead
2026-04-02175.19175.47-1.75TSM ahead
2026-04-01174.60176.74-1.85TSM ahead
2026-03-31172.38174.90-1.89TSM ahead
2026-03-30163.41163.80-1.80TSM ahead
2026-03-27167.46169.10-1.87TSM ahead
2026-03-26172.33168.78-1.62TSM ahead
2026-03-25177.56179.98-1.93TSM ahead
2026-03-24177.27177.65-1.85TSM ahead
2026-03-23179.62175.16-1.62TSM ahead
2026-03-20172.94170.40-1.73TSM ahead
2026-03-19178.13175.34-1.74TSM ahead
2026-03-18175.96175.74-1.88TSM ahead
2026-03-17178.95179.06-1.92TSM ahead
2026-03-16180.96176.08-1.69TSM ahead
2026-03-13179.43175.09-1.73TSM ahead
2026-03-12187.12174.26-1.31TSM ahead
2026-03-11190.24183.50-1.64TSM ahead
2026-03-10190.80179.63-1.43TSM ahead
2026-03-09192.56180.47-1.39TSM ahead
2026-03-06184.06175.39-1.55TSM ahead
2026-03-05185.34183.14-1.90TSM ahead
2026-03-04176.85184.99-2.46TSM ahead
2026-03-03174.79182.76-2.49TSM ahead
2026-03-02177.57191.03-2.81TSM ahead
2026-02-27177.97193.86-2.99TSM ahead
2026-02-26179.17195.02-3.05TSM ahead
2026-02-25185.08200.67-3.07TSM ahead
2026-02-24181.28199.64-3.31TSM ahead
2026-02-23183.98191.51-2.77TSM ahead
2026-02-20185.27191.77-2.77TSM ahead
2026-02-19186.02186.52-2.46TSM ahead
2026-02-18185.75187.49-2.58TSM ahead
2026-02-17185.21188.49-2.72TSM ahead
2026-02-13181.10189.61-3.10TSM ahead
2026-02-12184.44190.51-3.01TSM ahead
2026-02-11190.90193.61-2.85TSM ahead
2026-02-10189.61187.30-2.58TSM ahead
2026-02-09191.56183.94-2.27TSM ahead
2026-02-06185.42180.55-2.48TSM ahead
2026-02-05172.94171.17-2.71TSM ahead
2026-02-04171.57168.59-2.67TSM ahead
2026-02-03178.41173.77-2.59TSM ahead
2026-02-02184.41176.67-2.40TSM ahead
2026-01-30184.52171.08-1.99TSM ahead
2026-01-29184.20175.73-2.37TSM ahead
2026-01-28185.60177.16-2.39TSM ahead
2026-01-27185.35175.11-2.29TSM ahead
2026-01-26180.92172.19-2.41TSM ahead
2026-01-23178.25173.31-2.73TSM ahead
2026-01-22181.28169.43-2.23TSM ahead
2026-01-21183.12168.78-2.07TSM ahead
2026-01-20185.24169.32-1.97TSM ahead
2026-01-16195.88177.21-1.84TSM ahead
2026-01-15191.04176.81-2.17TSM ahead
2026-01-14189.30169.29-1.72TSM ahead
2026-01-13197.50171.42-1.31TSM ahead
2026-01-12196.16171.71-1.43TSM ahead
2026-01-09192.13167.49-1.38TSM ahead
2026-01-08185.17164.58-1.65TSM ahead
2026-01-07191.31164.93-1.24TSM ahead
2026-01-06191.46169.46-1.61TSM ahead
2026-01-05191.27166.78-1.42TSM ahead
2026-01-02193.61165.41-1.14TSM ahead
2025-12-31192.76157.28-0.50TSM ahead
2025-12-30194.85155.05-0.16near the usual relationship
2025-12-29194.59155.74-0.24near the usual relationship
2025-12-26196.12156.73-0.21near the usual relationship
2025-12-24195.05154.64-0.10near the usual relationship
2025-12-23194.55153.68-0.05near the usual relationship
2025-12-22190.17151.79-0.19near the usual relationship
2025-12-19189.56149.54-0.03near the usual relationship
2025-12-18183.73147.33-0.26near the usual relationship
2025-12-17181.58143.34-0.04near the usual relationship
2025-12-16190.09148.47+0.12near the usual relationship
2025-12-15189.26148.92+0.03near the usual relationship
2025-12-12200.46151.14+0.60AVGO ahead
2025-12-11226.33157.77+1.61AVGO ahead
2025-12-10230.00160.51+1.58AVGO ahead
2025-12-09226.28157.03+1.63AVGO ahead
2025-12-08223.39156.23+1.52AVGO ahead
2025-12-05217.34152.53+1.46AVGO ahead
2025-12-04212.21151.60+1.25AVGO ahead
2025-12-03211.98152.91+1.14AVGO ahead
2025-12-02212.51151.17+1.29AVGO ahead
2025-12-01215.03148.89+1.59AVGO ahead
2025-11-28224.43150.87+1.91AVGO ahead
2025-11-26221.43150.07+1.82AVGO ahead
2025-11-25214.44147.33+1.67AVGO ahead
2025-11-24210.50147.31+1.47AVGO ahead
2025-11-21189.47142.36+0.74AVGO ahead
2025-11-20193.16143.62+0.85AVGO ahead
2025-11-19197.39146.14+0.90AVGO ahead
2025-11-18189.64143.83+0.67AVGO ahead
2025-11-17190.84145.95+0.59AVGO ahead
2025-11-14190.73147.41+0.49near the usual relationship
2025-11-13189.35146.05+0.52AVGO ahead
2025-11-12197.84150.41+0.66AVGO ahead
2025-11-11196.02150.69+0.56AVGO ahead
2025-11-10199.60152.82+0.61AVGO ahead
2025-11-07194.61148.28+0.66AVGO ahead
2025-11-06198.05149.69+0.74AVGO ahead
2025-11-05199.93151.97+0.69AVGO ahead
2025-11-04196.01152.18+0.50AVGO ahead
2025-11-03201.92157.78+0.45near the usual relationship
2025-10-31205.86155.49+0.76AVGO ahead
2025-10-30209.67156.93+0.85AVGO ahead
2025-10-29214.97157.90+1.02AVGO ahead
2025-10-28207.72156.06+0.83AVGO ahead
2025-10-27201.64154.36+0.67AVGO ahead
2025-10-24197.23152.66+0.58AVGO ahead
2025-10-23191.75150.47+0.47near the usual relationship
2025-10-22189.53149.51+0.43near the usual relationship
2025-10-21190.84152.42+0.33near the usual relationship
2025-10-20194.51154.07+0.41near the usual relationship
2025-10-17194.56152.72+0.49near the usual relationship
2025-10-16197.24155.18+0.48near the usual relationship
2025-10-15195.67157.70+0.28near the usual relationship
2025-10-14191.66153.16+0.36near the usual relationship
2025-10-13198.66156.76+0.47near the usual relationship
2025-10-10180.80145.25+0.32near the usual relationship
2025-10-09192.16155.20+0.29near the usual relationship
2025-10-08192.43157.60+0.18near the usual relationship
2025-10-07187.36152.17+0.25near the usual relationship
2025-10-06186.85156.51+0.00near the usual relationship
2025-10-03188.45151.22+0.36near the usual relationship
2025-10-02188.35149.11+0.47near the usual relationship
2025-10-01185.68149.30+0.35near the usual relationship
2025-09-30183.74144.55+0.53AVGO ahead
2025-09-29182.62141.41+0.67AVGO ahead
2025-09-26186.32141.48+0.83AVGO ahead
2025-09-25187.19143.18+0.78AVGO ahead
2025-09-24188.98145.28+0.74AVGO ahead
2025-09-23188.77146.32+0.68AVGO ahead
2025-09-22188.69141.10+0.98AVGO ahead
2025-09-19192.11137.08+1.36AVGO ahead
2025-09-18192.34139.03+1.27AVGO ahead
2025-09-17192.80136.01+1.48AVGO ahead
2025-09-16200.50135.63+1.84AVGO ahead
2025-09-15202.78135.28+1.97AVGO ahead
2025-09-12200.43134.21+1.96AVGO ahead
2025-09-11200.30134.00+1.98AVGO ahead
2025-09-10205.83134.79+2.18AVGO ahead
2025-09-09187.51129.86+1.74AVGO ahead
2025-09-08192.51127.93+2.10AVGO ahead
2025-09-05186.52125.98+1.99AVGO ahead
2025-09-04170.48121.73+1.55AVGO ahead
2025-09-03168.42119.75+1.60AVGO ahead
2025-09-02166.10118.20+1.60AVGO ahead
2025-08-29165.63119.49+1.50AVGO ahead
2025-08-28171.90123.32+1.56AVGO ahead
2025-08-27167.22123.84+1.31AVGO ahead
2025-08-26165.98123.55+1.28AVGO ahead
2025-08-25163.87121.93+1.29AVGO ahead
2025-08-22163.74120.58+1.39AVGO ahead
2025-08-21161.29117.65+1.48AVGO ahead
2025-08-20162.17118.31+1.50AVGO ahead
2025-08-19164.25120.43+1.47AVGO ahead
2025-08-18170.29124.94+1.47AVGO ahead
2025-08-15170.62123.63+1.59AVGO ahead
2025-08-14173.34124.73+1.67AVGO ahead
2025-08-13172.15124.96+1.61AVGO ahead
2025-08-12174.23126.43+1.62AVGO ahead
2025-08-11169.26125.29+1.46AVGO ahead
2025-08-08169.85125.16+1.51AVGO ahead
2025-08-07169.18125.57+1.47AVGO ahead
2025-08-06168.01119.74+1.83AVGO ahead
2025-08-05163.15120.31+1.55AVGO ahead
2025-08-04165.81123.69+1.47AVGO ahead
2025-08-01160.76121.73+1.35AVGO ahead
2025-07-31163.58125.05+1.28AVGO ahead
2025-07-30168.54125.72+1.51AVGO ahead
2025-07-29165.65124.90+1.42AVGO ahead
2025-07-28163.91125.63+1.29AVGO ahead
2025-07-25161.62127.11+1.07AVGO ahead
2025-07-24160.80125.04+1.18AVGO ahead
2025-07-23158.00124.38+1.08AVGO ahead
2025-07-22155.16121.42+1.14AVGO ahead
2025-07-21160.52123.62+1.30AVGO ahead
2025-07-18157.81124.42+1.10AVGO ahead
2025-07-17159.54127.11+1.01AVGO ahead
2025-07-16156.40122.95+1.14AVGO ahead
2025-07-15156.47122.63+1.18AVGO ahead
2025-07-14153.49118.35+1.33AVGO ahead
2025-07-11152.82119.24+1.24AVGO ahead
2025-07-10153.38118.91+1.30AVGO ahead
2025-07-09154.78119.99+1.32AVGO ahead
2025-07-08151.38117.93+1.28AVGO ahead
2025-07-07152.70118.61+1.32AVGO ahead
2025-07-03153.26121.52+1.15AVGO ahead
2025-07-02150.32120.90+1.03AVGO ahead
2025-07-01147.45116.28+1.21AVGO ahead
2025-06-30153.52117.22+1.52AVGO ahead
2025-06-27150.01118.30+1.24AVGO ahead
2025-06-26150.47115.94+1.46AVGO ahead
2025-06-25147.40115.28+1.33AVGO ahead
2025-06-24146.91113.91+1.42AVGO ahead
2025-06-23141.34108.85+1.50AVGO ahead
2025-06-20139.23108.43+1.41AVGO ahead
2025-06-18139.94110.50+1.29AVGO ahead
2025-06-17138.89110.70+1.22AVGO ahead
2025-06-16140.41111.62+1.25AVGO ahead
2025-06-13138.51109.25+1.33AVGO ahead
2025-06-12142.62111.49+1.42AVGO ahead
2025-06-11140.86110.81+1.38AVGO ahead
2025-06-10136.25109.96+1.15AVGO ahead
2025-06-09136.05107.13+1.39AVGO ahead
2025-06-06137.53106.19+1.58AVGO ahead
2025-06-05144.77105.24+2.15AVGO ahead
2025-06-04145.41104.75+2.27AVGO ahead
2025-06-03143.05102.27+2.37AVGO ahead
2025-06-02138.52100.84+2.23AVGO ahead
2025-05-30134.82100.05+2.08AVGO ahead
2025-05-29134.76102.03+1.91AVGO ahead
2025-05-28133.35101.51+1.88AVGO ahead
2025-05-27131.24102.31+1.67AVGO ahead
2025-05-23127.3999.36+1.68AVGO ahead
2025-05-22128.39101.54+1.56AVGO ahead
2025-05-21127.9599.24+1.76AVGO ahead
2025-05-20129.03100.12+1.78AVGO ahead
2025-05-19128.45100.14+1.75AVGO ahead
2025-05-16127.32100.52+1.65AVGO ahead
2025-05-15129.57100.52+1.84AVGO ahead
2025-05-14129.28100.80+1.81AVGO ahead
2025-05-13129.45100.40+1.88AVGO ahead
2025-05-12123.4196.77+1.79AVGO ahead
2025-05-09115.9691.36+1.76AVGO ahead
2025-05-08115.7290.68+1.84AVGO ahead
2025-05-07114.0790.33+1.75AVGO ahead
2025-05-06111.4489.16+1.66AVGO ahead
2025-05-05111.7991.29+1.47AVGO ahead
2025-05-02113.4292.79+1.46AVGO ahead
2025-05-01109.9089.39+1.53AVGO ahead
2025-04-30107.2086.27+1.66AVGO ahead
2025-04-29106.4785.13+1.75AVGO ahead
2025-04-28107.2084.57+1.91AVGO ahead
2025-04-25107.1185.45+1.81AVGO ahead
2025-04-24104.7984.97+1.65AVGO ahead
2025-04-2398.5381.67+1.43AVGO ahead
2025-04-2294.4578.36+1.44AVGO ahead
2025-04-2192.5776.52+1.49AVGO ahead
2025-04-1795.2378.53+1.53AVGO ahead
2025-04-1697.2578.50+1.78AVGO ahead
2025-04-1599.6781.43+1.66AVGO ahead
2025-04-1499.3480.65+1.75AVGO ahead
2025-04-11101.3381.30+1.90AVGO ahead
2025-04-1095.9678.22+1.75AVGO ahead
2025-04-09103.1282.16+2.02AVGO ahead
2025-04-0886.9073.17+1.42AVGO ahead
2025-04-0785.8575.65+0.92AVGO ahead
2025-04-0481.4875.98+0.28near the usual relationship
2025-04-0385.7881.45+0.08near the usual relationship
2025-04-0295.8588.18+0.44near the usual relationship
2025-04-0193.8687.28+0.32near the usual relationship
2025-03-3193.2585.91+0.42near the usual relationship
2025-03-2894.1985.52+0.59AVGO ahead
2025-03-2795.7987.07+0.58AVGO ahead
2025-03-2699.8489.79+0.71AVGO ahead
2025-03-25104.8593.62+0.79AVGO ahead
2025-03-24106.5293.76+0.96AVGO ahead
2025-03-21106.7491.47+1.27AVGO ahead
2025-03-20106.1291.85+1.17AVGO ahead
2025-03-19108.9289.93+1.72AVGO ahead
2025-03-18105.0889.60+1.37AVGO ahead
2025-03-17108.3391.21+1.52AVGO ahead
2025-03-14108.9190.10+1.74AVGO ahead
2025-03-13106.5888.81+1.68AVGO ahead
2025-03-12108.1891.69+1.50AVGO ahead
2025-03-11105.8788.48+1.68AVGO ahead
2025-03-10102.7388.32+1.36AVGO ahead
2025-03-07108.5891.66+1.58AVGO ahead
2025-03-0699.9491.01+0.69AVGO ahead
2025-03-05106.7095.37+0.91AVGO ahead
2025-03-04104.4293.16+0.93AVGO ahead
2025-03-03104.3689.52+1.40AVGO ahead
2025-02-28111.0793.43+1.65AVGO ahead
2025-02-27110.1693.72+1.52AVGO ahead
2025-02-26118.60100.72+1.55AVGO ahead
2025-02-25112.8098.01+1.29AVGO ahead
2025-02-24115.8199.19+1.47AVGO ahead
2025-02-21121.78102.60+1.69AVGO ahead
2025-02-20126.28103.56+2.03AVGO ahead
2025-02-19127.39104.00+2.11AVGO ahead
2025-02-18127.28104.93+2.02AVGO ahead
2025-02-14129.79105.53+2.22AVGO ahead
2025-02-13131.33104.46+2.53AVGO ahead
2025-02-12131.63106.81+2.31AVGO ahead
2025-02-11130.91108.03+2.12AVGO ahead
2025-02-10130.91107.62+2.20AVGO ahead
2025-02-07125.24106.68+1.75AVGO ahead
2025-02-06128.86108.94+1.85AVGO ahead
2025-02-05129.21107.94+2.02AVGO ahead
2025-02-04123.88105.61+1.76AVGO ahead
2025-02-03121.26103.41+1.77AVGO ahead
2025-01-31123.24108.33+1.36AVGO ahead
2025-01-30120.11107.73+1.10AVGO ahead
2025-01-29114.93104.71+0.89AVGO ahead
2025-01-28115.49104.75+0.94AVGO ahead
2025-01-27112.5899.53+1.28AVGO ahead
2025-01-24136.29114.83+1.92AVGO ahead
2025-01-23133.82116.25+1.52AVGO ahead
2025-01-22134.17115.52+1.64AVGO ahead
2025-01-21133.84113.19+1.89AVGO ahead
2025-01-17132.24109.46+2.19AVGO ahead
2025-01-16127.77111.16+1.52AVGO ahead
2025-01-15126.98107.03+1.94AVGO ahead
2025-01-14125.15104.26+2.11AVGO ahead
2025-01-13125.47104.21+2.16AVGO ahead
2025-01-10124.93107.84+1.64AVGO ahead
2025-01-08127.71107.19+2.03AVGO ahead
2025-01-07127.34109.42+1.72AVGO ahead
2025-01-06131.67113.87+1.63AVGO ahead
2025-01-03129.52107.97+2.15AVGO ahead
2025-01-02129.20104.33+2.61AVGO ahead
2024-12-31129.12102.21+2.92AVGO ahead
2024-12-30131.21103.71+2.98AVGO ahead
2024-12-27134.64104.35+3.32AVGO ahead
2024-12-26136.65105.09+3.49AVGO ahead
2024-12-24133.49106.79+2.95AVGO ahead
2024-12-23129.41107.32+2.43AVGO ahead
2024-12-20122.97102.07+2.42AVGO ahead
2024-12-19121.59100.73+2.45AVGO ahead
2024-12-18124.54101.21+2.75AVGO ahead
2024-12-17133.80103.85+3.49AVGO ahead
2024-12-16139.24104.66+4.09AVGO ahead
2024-12-13125.20104.02+2.55AVGO ahead
2024-12-12100.6299.09-0.10near the usual relationship
2024-12-11102.03100.71-0.14near the usual relationship
2024-12-1095.6999.34-0.93TSM ahead
2024-12-0999.66103.08-0.88TSM ahead
2024-12-0699.99105.07-1.13TSM ahead
2024-12-0594.94105.73-2.05TSM ahead
2024-12-0494.99103.87-1.78TSM ahead
2024-12-0393.65102.93-1.89TSM ahead
2024-12-0292.74100.61-1.70TSM ahead
2024-11-2990.2795.57-1.32TSM ahead
2024-11-2788.9393.77-1.26TSM ahead
2024-11-2691.7595.15-1.00TSM ahead
2024-11-2591.8095.79-1.11TSM ahead
2024-11-2291.4798.37-1.61TSM ahead
2024-11-2191.3198.98-1.76TSM ahead
2024-11-2090.9297.48-1.60TSM ahead
2024-11-1992.0998.16-1.51TSM ahead
2024-11-1892.2797.03-1.30TSM ahead
2024-11-1591.8196.27-1.26TSM ahead
2024-11-1494.8997.56-0.95TSM ahead
2024-11-1396.6896.60-0.48near the usual relationship
2024-11-1298.1599.25-0.68TSM ahead
2024-11-1199.64100.43-0.63TSM ahead
2024-11-08102.28104.13-0.80TSM ahead
2024-11-07102.37104.12-0.79TSM ahead
2024-11-06100.00100.00-0.51TSM ahead

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Dec 13, 2024 (AVGO +24.4%, TSM +5.0%); Dec 16, 2024 (AVGO +11.2%, TSM +0.6%); Jun 4, 2026 (AVGO -12.6%, TSM +1.9%).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

1 simulated trade to Nov 3, 2026: -17.19% per trade on average after costs, 0 won.

LegsEnteredExitedWhyDaysBefore costsCosts + borrowAfter costs
Long TSM · Short AVGOJan 10, 2025Jun 4, 2025divergence stop145-$1,621.24-$43.98-$1,718.74 (-17.19%)

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

AVGO and TSM at a glance

AVGO Broadcom Inc.

Listing
Nasdaq · SEC CIK 1730168
Industry
Semiconductors · SIC 3674 Semiconductors & Related Devices
Market value
$1.59T
Price history
2,534 daily closes, Oct 12, 2016 to Nov 10, 2026

TSM Taiwan Semiconductor Manufacturing Company Ltd.

Listing
NYSE · SEC CIK 1046179
Industry
Semiconductors · SIC 3674 Semiconductors & Related Devices
Market value
$2.10T
Price history
2,534 daily closes, Oct 12, 2016 to Nov 10, 2026

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
NVDA / TSMWatchlistTSM by 2.39 sdSemiconductors
NVDA / AVGOWatchlistAVGO by 0.86 sdSemiconductors

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.