RETAIL: Building Materials

Lowe's Companies Inc. vs The Sherwin-Williams Company

WatchlistLOW / SHWPrices through Nov 10, 2026

Why these are rivals: #2 and #3 by market value ($120B vs $82B) in Nasdaq's "RETAIL: Building Materials" industry; SEC SIC 5211 / 5200 (same major group).

Rivals, but right now the price gap does not have a measured habit of closing, so there is no paper idea, whatever the gap.

  • Mean reversion: ADF t-statistic of the spread: -0.89 (needs <= -2.873 (5% critical value))
  • Speed: half-life of the spread, sessions: 87.71 (needs <= 63)
Business leadership

LOW is the larger business

Annual revenue reported to the SEC. Scale, not market share.

YearLOWSHWLarger
2025$86.3B$23.6BLOW
2024$83.7B$23.1BLOW
2023$86.4B$23.1BLOW
2022$97.1B$22.1BLOW
2021$96.3B$19.9BLOW
2020$89.6B$18.4BLOW

LOW led in every year with figures for both. Market value: LOW $119.7B, SHW $82.4B.

Stock leadership

SHW is ahead now

Measured against the pair's own last 252 trading days.

SHW leads LOW by 0.48 standard deviations: +4.8% over its usual price ratio. 1 lead switch in the last year.

Price change3 mo6 mo12 mo
LOW+7.4%+3.3%-0.6%
SHW-1.3%+14.0%+4.5%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 2534 (needs >= 254)
Pass
Co-movement: daily return correlation, 252 sessions: 0.77 (needs >= 0.60)
Fail
Mean reversion: ADF t-statistic of the spread: -0.89 (needs <= -2.873 (5% critical value))
Fail
Speed: half-life of the spread, sessions: 87.71 (needs <= 63)
Data
Both stocks current
The twins over two years

Prices side by side, and the gap between them

LOW Lowe's Companies Inc. SHW The Sherwin-Williams CompanyPrice index, 100 = 2024-11-06. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
80100Nov 2024Nov 2025Nov 2026LOW 89SHW 93
Spread z-score: LOW relative to SHW, against the 252 sessions before each day. Above 0: LOW ahead; below 0: SHW ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopNov 2024Nov 2025Nov 2026
Data table (504 sessions)
DateLOW indexSHW indexzAhead
2026-11-1088.5993.33-0.48near the usual relationship
2026-11-0988.6894.01-0.55SHW ahead
2026-11-0685.7990.38-0.49near the usual relationship
2026-11-0586.8291.67-0.51SHW ahead
2026-11-0487.6495.47-0.84SHW ahead
2026-11-0381.5389.53-0.93SHW ahead
2026-11-0283.3592.55-1.05SHW ahead
2026-10-3079.8887.36-0.89SHW ahead
2026-10-2979.2086.70-0.91SHW ahead
2026-10-2875.8084.26-1.08SHW ahead
2026-10-2775.7285.63-1.27SHW ahead
2026-10-2675.7388.03-1.57SHW ahead
2026-10-2375.9188.53-1.62SHW ahead
2026-10-2278.0890.78-1.60SHW ahead
2026-10-2175.1088.59-1.77SHW ahead
2026-10-2075.8588.25-1.64SHW ahead
2026-10-1974.8687.10-1.66SHW ahead
2026-10-1675.4188.04-1.71SHW ahead
2026-10-1574.7888.49-1.88SHW ahead
2026-10-1471.9585.24-1.92SHW ahead
2026-10-1372.1185.13-1.90SHW ahead
2026-10-1270.9084.10-1.97SHW ahead
2026-10-0971.0783.88-1.94SHW ahead
2026-10-0872.1584.32-1.85SHW ahead
2026-10-0769.3682.74-2.11SHW ahead
2026-10-0670.1884.35-2.23SHW ahead
2026-10-0568.5883.64-2.43SHW ahead
2026-10-0269.0883.92-2.42SHW ahead
2026-10-0169.6884.25-2.41SHW ahead
2026-09-3070.4184.91-2.41SHW ahead
2026-09-2971.5586.79-2.52SHW ahead
2026-09-2871.7087.41-2.63SHW ahead
2026-09-2572.3286.44-2.42SHW ahead
2026-09-2472.0284.15-2.17SHW ahead
2026-09-2373.1185.75-2.25SHW ahead
2026-09-2274.9286.24-2.04SHW ahead
2026-09-2172.9784.39-2.13SHW ahead
2026-09-1873.5584.24-2.03SHW ahead
2026-09-1774.1984.30-1.95SHW ahead
2026-09-1674.1684.43-2.00SHW ahead
2026-09-1574.3684.89-2.06SHW ahead
2026-09-1475.7285.23-1.90SHW ahead
2026-09-1175.2084.92-1.96SHW ahead
2026-09-1075.1183.38-1.75SHW ahead
2026-09-0975.8884.22-1.77SHW ahead
2026-09-0876.7285.65-1.87SHW ahead
2026-09-0478.1187.65-1.96SHW ahead
2026-09-0377.1487.27-2.10SHW ahead
2026-09-0276.3587.00-2.23SHW ahead
2026-09-0176.4386.66-2.19SHW ahead
2026-08-3178.2188.99-2.27SHW ahead
2026-08-2879.4990.58-2.32SHW ahead
2026-08-2778.9990.67-2.46SHW ahead
2026-08-2680.3791.58-2.39SHW ahead
2026-08-2581.9992.05-2.21SHW ahead
2026-08-2482.9091.07-1.91SHW ahead
2026-08-2182.5691.03-1.99SHW ahead
2026-08-2083.0491.12-1.93SHW ahead
2026-08-1984.0692.87-2.06SHW ahead
2026-08-1882.3990.69-2.03SHW ahead
2026-08-1782.4691.92-2.25SHW ahead
2026-08-1483.4794.32-2.49SHW ahead
2026-08-1383.3894.96-2.66SHW ahead
2026-08-1282.5294.61-2.81SHW ahead
2026-08-1184.5395.72-2.65SHW ahead
2026-08-1083.6395.27-2.79SHW ahead
2026-08-0785.3497.11-2.82SHW ahead
2026-08-0683.4495.45-2.96SHW ahead
2026-08-0584.0397.10-3.20SHW ahead
2026-08-0483.3294.97-3.01SHW ahead
2026-08-0381.0293.04-3.20SHW ahead
2026-07-3179.4089.53-2.93SHW ahead
2026-07-3080.2790.57-3.00SHW ahead
2026-07-2982.4190.32-2.50SHW ahead
2026-07-2883.3893.05-2.88SHW ahead
2026-07-2780.8385.96-1.98SHW ahead
2026-07-2479.3383.40-1.77SHW ahead
2026-07-2377.1581.56-1.89SHW ahead
2026-07-2278.0884.03-2.23SHW ahead
2026-07-2177.7683.64-2.22SHW ahead
2026-07-2078.2184.99-2.42SHW ahead
2026-07-1779.7587.02-2.51SHW ahead
2026-07-1682.5988.81-2.23SHW ahead
2026-07-1580.1187.28-2.49SHW ahead
2026-07-1479.3586.28-2.46SHW ahead
2026-07-1379.3686.41-2.50SHW ahead
2026-07-1080.8687.72-2.44SHW ahead
2026-07-0981.3887.21-2.20SHW ahead
2026-07-0881.3286.83-2.13SHW ahead
2026-07-0784.4089.90-2.09SHW ahead
2026-07-0685.5091.70-2.22SHW ahead
2026-07-0286.9292.58-2.09SHW ahead
2026-07-0184.7990.89-2.22SHW ahead
2026-06-3084.2490.44-2.25SHW ahead
2026-06-2983.9290.43-2.33SHW ahead
2026-06-2685.0090.37-2.06SHW ahead
2026-06-2584.7989.06-1.82SHW ahead
2026-06-2484.6187.50-1.50SHW ahead
2026-06-2381.5984.81-1.59SHW ahead
2026-06-2281.9283.23-1.14SHW ahead
2026-06-1884.9084.26-0.69SHW ahead
2026-06-1783.0182.42-0.68SHW ahead
2026-06-1685.5984.69-0.61SHW ahead
2026-06-1584.1384.11-0.79SHW ahead
2026-06-1284.3583.34-0.55SHW ahead
2026-06-1184.4683.23-0.49near the usual relationship
2026-06-1082.6079.82-0.13near the usual relationship
2026-06-0983.0581.57-0.41near the usual relationship
2026-06-0879.4678.68-0.54SHW ahead
2026-06-0580.5280.19-0.63SHW ahead
2026-06-0479.2978.82-0.59SHW ahead
2026-06-0379.3477.87-0.36near the usual relationship
2026-06-0278.9576.96-0.23near the usual relationship
2026-06-0179.3677.45-0.24near the usual relationship
2026-05-2981.9079.80-0.21near the usual relationship
2026-05-2883.2680.15+0.00near the usual relationship
2026-05-2782.8581.41-0.33near the usual relationship
2026-05-2681.0381.75-0.74SHW ahead
2026-05-2282.1681.18-0.40near the usual relationship
2026-05-2183.0781.25-0.23near the usual relationship
2026-05-2084.4680.82+0.12near the usual relationship
2026-05-1983.4378.55+0.39near the usual relationship
2026-05-1883.3079.53+0.17near the usual relationship
2026-05-1583.4578.82+0.35near the usual relationship
2026-05-1485.4481.21+0.25near the usual relationship
2026-05-1384.2380.46+0.18near the usual relationship
2026-05-1285.7881.84+0.21near the usual relationship
2026-05-1186.3782.13+0.27near the usual relationship
2026-05-0887.5783.21+0.28near the usual relationship
2026-05-0788.2184.10+0.24near the usual relationship
2026-05-0689.1685.00+0.25near the usual relationship
2026-05-0586.0582.07+0.25near the usual relationship
2026-05-0485.4881.55+0.25near the usual relationship
2026-05-0189.1583.52+0.52LOW ahead
2026-04-3091.2484.47+0.71LOW ahead
2026-04-2989.2183.48+0.55LOW ahead
2026-04-2891.8285.17+0.69LOW ahead
2026-04-2792.6788.28+0.30near the usual relationship
2026-04-2493.4088.70+0.35near the usual relationship
2026-04-2394.2088.69+0.48near the usual relationship
2026-04-2293.6888.03+0.52LOW ahead
2026-04-2195.9787.89+0.90LOW ahead
2026-04-2096.7890.33+0.63LOW ahead
2026-04-1796.1890.76+0.47near the usual relationship
2026-04-1692.6287.55+0.45near the usual relationship
2026-04-1593.2286.37+0.75LOW ahead
2026-04-1494.9287.62+0.81LOW ahead
2026-04-1394.4087.83+0.71LOW ahead
2026-04-1093.3188.28+0.47near the usual relationship
2026-04-0994.6888.18+0.70LOW ahead
2026-04-0893.1088.16+0.46near the usual relationship
2026-04-0788.4982.46+0.70LOW ahead
2026-04-0689.8683.10+0.82LOW ahead
2026-04-0288.2783.52+0.49near the usual relationship
2026-04-0190.1685.55+0.46near the usual relationship
2026-03-3190.2884.19+0.71LOW ahead
2026-03-3088.8682.97+0.70LOW ahead
2026-03-2788.0082.83+0.59LOW ahead
2026-03-2690.1883.93+0.76LOW ahead
2026-03-2590.2484.56+0.66LOW ahead
2026-03-2489.5782.39+0.94LOW ahead
2026-03-2389.5082.46+0.92LOW ahead
2026-03-2085.8379.72+0.81LOW ahead
2026-03-1987.7781.52+0.81LOW ahead
2026-03-1888.2981.98+0.83LOW ahead
2026-03-1791.5984.23+0.97LOW ahead
2026-03-1692.5084.76+1.03LOW ahead
2026-03-1390.7883.99+0.90LOW ahead
2026-03-1291.4983.44+1.12LOW ahead
2026-03-1194.3384.77+1.34LOW ahead
2026-03-1095.9486.76+1.26LOW ahead
2026-03-0995.6087.57+1.08LOW ahead
2026-03-0696.2486.64+1.35LOW ahead
2026-03-0597.3288.11+1.28LOW ahead
2026-03-0498.8191.32+0.98LOW ahead
2026-03-0398.4691.62+0.88LOW ahead
2026-03-0298.2693.53+0.55LOW ahead
2026-02-27101.0995.24+0.71LOW ahead
2026-02-26101.0294.69+0.79LOW ahead
2026-02-25100.4993.83+0.85LOW ahead
2026-02-24106.4495.80+1.41LOW ahead
2026-02-23104.8395.68+1.21LOW ahead
2026-02-20107.1294.72+1.70LOW ahead
2026-02-19106.2993.93+1.72LOW ahead
2026-02-18107.7996.07+1.61LOW ahead
2026-02-17107.4296.64+1.47LOW ahead
2026-02-13109.8096.89+1.79LOW ahead
2026-02-12109.0997.86+1.54LOW ahead
2026-02-11109.6796.39+1.88LOW ahead
2026-02-10108.7695.78+1.87LOW ahead
2026-02-09105.7994.71+1.62LOW ahead
2026-02-06106.3695.08+1.66LOW ahead
2026-02-05105.0394.83+1.51LOW ahead
2026-02-04105.3996.90+1.23LOW ahead
2026-02-03105.0194.46+1.59LOW ahead
2026-02-02102.8093.60+1.40LOW ahead
2026-01-30102.0493.15+1.36LOW ahead
2026-01-29101.8893.13+1.35LOW ahead
2026-01-28102.9491.82+1.75LOW ahead
2026-01-27104.6790.90+2.21LOW ahead
2026-01-26106.1891.49+2.37LOW ahead
2026-01-23105.7391.54+2.31LOW ahead
2026-01-22105.0592.09+2.13LOW ahead
2026-01-21105.8893.59+2.00LOW ahead
2026-01-20102.5591.13+1.93LOW ahead
2026-01-16106.0493.99+1.99LOW ahead
2026-01-15105.8493.54+2.05LOW ahead
2026-01-14105.0593.07+2.02LOW ahead
2026-01-13104.7893.50+1.91LOW ahead
2026-01-12103.5093.93+1.62LOW ahead
2026-01-09102.0992.79+1.60LOW ahead
2026-01-0897.8989.57+1.49LOW ahead
2026-01-0794.4287.05+1.36LOW ahead
2026-01-0694.1889.33+0.86LOW ahead
2026-01-0593.5187.25+1.15LOW ahead
2026-01-0294.3386.11+1.54LOW ahead
2025-12-3192.1485.11+1.34LOW ahead
2025-12-3092.9185.67+1.37LOW ahead
2025-12-2993.1685.42+1.48LOW ahead
2025-12-2693.4185.48+1.52LOW ahead
2025-12-2492.8485.45+1.43LOW ahead
2025-12-2392.5285.11+1.44LOW ahead
2025-12-2292.4985.06+1.46LOW ahead
2025-12-1991.8784.27+1.51LOW ahead
2025-12-1894.6485.46+1.81LOW ahead
2025-12-1794.7486.14+1.70LOW ahead
2025-12-1694.1786.12+1.60LOW ahead
2025-12-1595.0586.27+1.75LOW ahead
2025-12-1294.4886.33+1.64LOW ahead
2025-12-1194.7886.49+1.67LOW ahead
2025-12-1094.0785.70+1.71LOW ahead
2025-12-0992.7284.35+1.75LOW ahead
2025-12-0893.5485.92+1.59LOW ahead
2025-12-0594.9387.49+1.54LOW ahead
2025-12-0494.0588.09+1.25LOW ahead
2025-12-0394.3589.10+1.10LOW ahead
2025-12-0292.9188.64+0.91LOW ahead
2025-12-0194.1489.69+0.94LOW ahead
2025-11-2892.6590.27+0.52LOW ahead
2025-11-2692.3190.19+0.47near the usual relationship
2025-11-2590.9790.00+0.24near the usual relationship
2025-11-2487.4088.78-0.26near the usual relationship
2025-11-2189.5288.53+0.24near the usual relationship
2025-11-2087.2886.15+0.27near the usual relationship
2025-11-1987.2786.62+0.17near the usual relationship
2025-11-1883.8985.06-0.24near the usual relationship
2025-11-1785.9785.84+0.05near the usual relationship
2025-11-1487.0687.25-0.02near the usual relationship
2025-11-1388.4489.00-0.10near the usual relationship
2025-11-1289.6790.54-0.17near the usual relationship
2025-11-1189.9290.64-0.14near the usual relationship
2025-11-1089.0389.97-0.18near the usual relationship
2025-11-0789.0889.34-0.04near the usual relationship
2025-11-0688.3987.64+0.17near the usual relationship
2025-11-0589.5488.19+0.29near the usual relationship
2025-11-0490.8490.08+0.16near the usual relationship
2025-11-0390.0390.78-0.16near the usual relationship
2025-10-3190.9890.60+0.07near the usual relationship
2025-10-3091.6391.38+0.04near the usual relationship
2025-10-2991.1290.81+0.05near the usual relationship
2025-10-2893.2593.10+0.01near the usual relationship
2025-10-2793.0988.27+0.95LOW ahead
2025-10-2492.7387.73+0.98LOW ahead
2025-10-2393.1887.14+1.20LOW ahead
2025-10-2293.0587.68+1.06LOW ahead
2025-10-2193.7188.89+0.94LOW ahead
2025-10-2092.5687.00+1.11LOW ahead
2025-10-1793.4986.87+1.32LOW ahead
2025-10-1692.8887.06+1.16LOW ahead
2025-10-1592.2887.39+0.97LOW ahead
2025-10-1491.9888.06+0.77LOW ahead
2025-10-1389.5987.24+0.46near the usual relationship
2025-10-1088.7387.41+0.24near the usual relationship
2025-10-0989.6687.52+0.40near the usual relationship
2025-10-0890.7888.66+0.39near the usual relationship
2025-10-0791.6688.51+0.60LOW ahead
2025-10-0692.3488.49+0.73LOW ahead
2025-10-0394.1291.04+0.57LOW ahead
2025-10-0294.5090.33+0.78LOW ahead
2025-10-0194.7589.62+0.98LOW ahead
2025-09-3096.0290.95+0.96LOW ahead
2025-09-2996.7990.07+1.29LOW ahead
2025-09-2698.2489.80+1.63LOW ahead
2025-09-2597.6389.33+1.63LOW ahead
2025-09-2498.3290.08+1.62LOW ahead
2025-09-2399.2790.47+1.73LOW ahead
2025-09-2299.4990.99+1.68LOW ahead
2025-09-19101.3391.09+2.03LOW ahead
2025-09-18102.2391.81+2.07LOW ahead
2025-09-17102.3891.98+2.09LOW ahead
2025-09-16103.3692.77+2.14LOW ahead
2025-09-15103.9693.79+2.07LOW ahead
2025-09-12103.8694.58+1.91LOW ahead
2025-09-11104.0896.84+1.50LOW ahead
2025-09-10101.8493.89+1.70LOW ahead
2025-09-09102.7994.92+1.68LOW ahead
2025-09-08104.3198.56+1.23LOW ahead
2025-09-05103.1597.82+1.17LOW ahead
2025-09-04101.0996.07+1.13LOW ahead
2025-09-0399.6095.35+0.99LOW ahead
2025-09-0298.8694.80+0.96LOW ahead
2025-08-2998.6096.09+0.64LOW ahead
2025-08-2898.4096.18+0.58LOW ahead
2025-08-2798.8396.50+0.60LOW ahead
2025-08-2698.7096.25+0.63LOW ahead
2025-08-2598.9196.39+0.65LOW ahead
2025-08-22100.7697.95+0.70LOW ahead
2025-08-2197.6895.57+0.57LOW ahead
2025-08-2098.2596.43+0.51LOW ahead
2025-08-1997.9596.64+0.41near the usual relationship
2025-08-1895.8694.25+0.48near the usual relationship
2025-08-1596.3195.71+0.27near the usual relationship
2025-08-1496.6896.02+0.28near the usual relationship
2025-08-1397.9496.87+0.37near the usual relationship
2025-08-1293.5694.05+0.04near the usual relationship
2025-08-1191.6493.13-0.19near the usual relationship
2025-08-0892.1492.50+0.06near the usual relationship
2025-08-0791.1591.91-0.03near the usual relationship
2025-08-0691.0492.12-0.10near the usual relationship
2025-08-0590.7392.48-0.25near the usual relationship
2025-08-0489.3391.36-0.32near the usual relationship
2025-08-0186.5090.20-0.72SHW ahead
2025-07-3185.4286.91-0.22near the usual relationship
2025-07-3086.8987.20+0.06near the usual relationship
2025-07-2987.8988.51-0.01near the usual relationship
2025-07-2887.8788.29+0.03near the usual relationship
2025-07-2586.6589.33-0.49near the usual relationship
2025-07-2486.1889.36-0.62SHW ahead
2025-07-2387.3590.07-0.51SHW ahead
2025-07-2286.6789.32-0.51SHW ahead
2025-07-2184.4089.64-1.12SHW ahead
2025-07-1883.7489.32-1.21SHW ahead
2025-07-1783.5189.28-1.27SHW ahead
2025-07-1682.7689.27-1.46SHW ahead
2025-07-1582.1589.05-1.57SHW ahead
2025-07-1484.9790.48-1.22SHW ahead
2025-07-1185.6390.86-1.16SHW ahead
2025-07-1087.0892.41-1.17SHW ahead
2025-07-0986.1892.33-1.38SHW ahead
2025-07-0885.4690.88-1.24SHW ahead
2025-07-0785.9690.95-1.15SHW ahead
2025-07-0387.2392.98-1.30SHW ahead
2025-07-0286.7192.59-1.35SHW ahead
2025-07-0187.3693.32-1.37SHW ahead
2025-06-3084.7790.18-1.30SHW ahead
2025-06-2785.4490.80-1.29SHW ahead
2025-06-2684.5389.79-1.28SHW ahead
2025-06-2584.3290.25-1.44SHW ahead
2025-06-2484.0590.80-1.64SHW ahead
2025-06-2383.5190.29-1.67SHW ahead
2025-06-2081.2987.59-1.62SHW ahead
2025-06-1880.5587.06-1.69SHW ahead
2025-06-1780.9786.95-1.57SHW ahead
2025-06-1682.5688.19-1.48SHW ahead
2025-06-1383.0188.22-1.39SHW ahead
2025-06-1285.3993.56-2.01SHW ahead
2025-06-1184.6793.80-2.27SHW ahead
2025-06-1085.9294.75-2.20SHW ahead
2025-06-0985.4494.02-2.19SHW ahead
2025-06-0686.0793.89-2.04SHW ahead
2025-06-0586.9694.00-1.87SHW ahead
2025-06-0487.2695.14-2.07SHW ahead
2025-06-0387.4293.97-1.80SHW ahead
2025-06-0286.1793.36-1.99SHW ahead
2025-05-3086.2594.24-2.20SHW ahead
2025-05-2985.9493.44-2.12SHW ahead
2025-05-2885.7893.17-2.12SHW ahead
2025-05-2786.2894.38-2.31SHW ahead
2025-05-2384.4692.59-2.39SHW ahead
2025-05-2285.4992.70-2.18SHW ahead
2025-05-2186.8792.96-1.91SHW ahead
2025-05-2088.3594.32-1.87SHW ahead
2025-05-1989.5795.08-1.76SHW ahead
2025-05-1689.4995.48-1.90SHW ahead
2025-05-1588.8194.94-1.96SHW ahead
2025-05-1487.3192.29-1.73SHW ahead
2025-05-1388.1793.52-1.82SHW ahead
2025-05-1288.9493.81-1.71SHW ahead
2025-05-0984.9292.42-2.47SHW ahead
2025-05-0885.7792.87-2.39SHW ahead
2025-05-0785.4092.34-2.39SHW ahead
2025-05-0685.2192.59-2.54SHW ahead
2025-05-0586.0494.51-2.84SHW ahead
2025-05-0286.8094.46-2.66SHW ahead
2025-05-0184.9492.88-2.82SHW ahead
2025-04-3085.4292.70-2.68SHW ahead
2025-04-2985.3191.44-2.40SHW ahead
2025-04-2884.5087.25-1.48SHW ahead
2025-04-2584.4087.10-1.47SHW ahead
2025-04-2484.8487.84-1.57SHW ahead
2025-04-2383.2087.00-1.83SHW ahead
2025-04-2283.7087.19-1.75SHW ahead
2025-04-2181.2984.65-1.76SHW ahead
2025-04-1783.6787.56-1.91SHW ahead
2025-04-1681.9287.01-2.31SHW ahead
2025-04-1584.2588.48-2.05SHW ahead
2025-04-1485.6489.57-1.97SHW ahead
2025-04-1184.1988.45-2.11SHW ahead
2025-04-1084.5186.65-1.50SHW ahead
2025-04-0985.2888.32-1.78SHW ahead
2025-04-0880.8882.34-1.34SHW ahead
2025-04-0782.8984.79-1.48SHW ahead
2025-04-0485.3187.22-1.48SHW ahead
2025-04-0385.0289.47-2.27SHW ahead
2025-04-0289.8992.89-1.81SHW ahead
2025-04-0189.4192.08-1.73SHW ahead
2025-03-3189.1191.72-1.74SHW ahead
2025-03-2887.2789.24-1.57SHW ahead
2025-03-2788.7190.79-1.61SHW ahead
2025-03-2688.6690.46-1.54SHW ahead
2025-03-2588.1489.61-1.46SHW ahead
2025-03-2488.9890.01-1.33SHW ahead
2025-03-2186.7687.83-1.37SHW ahead
2025-03-2086.4588.26-1.61SHW ahead
2025-03-1986.1687.97-1.63SHW ahead
2025-03-1885.1888.13-2.02SHW ahead
2025-03-1786.2989.89-2.24SHW ahead
2025-03-1485.7589.77-2.41SHW ahead
2025-03-1385.0789.85-2.71SHW ahead
2025-03-1287.2491.88-2.68SHW ahead
2025-03-1188.9092.72-2.43SHW ahead
2025-03-1092.6193.97-1.63SHW ahead
2025-03-0792.7195.51-2.11SHW ahead
2025-03-0693.0394.58-1.73SHW ahead
2025-03-0592.8395.16-2.01SHW ahead
2025-03-0491.6493.32-1.82SHW ahead
2025-03-0394.0593.70-1.17SHW ahead
2025-02-2895.0095.15-1.34SHW ahead
2025-02-2793.8093.38-1.16SHW ahead
2025-02-2694.4094.45-1.33SHW ahead
2025-02-2592.6192.72-1.36SHW ahead
2025-02-2490.5890.32-1.24SHW ahead
2025-02-2191.3890.50-1.04SHW ahead
2025-02-2094.1591.93-0.60SHW ahead
2025-02-1994.2592.41-0.74SHW ahead
2025-02-1895.7992.71-0.34near the usual relationship
2025-02-1496.2093.73-0.55SHW ahead
2025-02-1396.5394.85-0.82SHW ahead
2025-02-1295.6293.37-0.63SHW ahead
2025-02-1198.2094.92-0.31near the usual relationship
2025-02-1097.9894.33-0.19near the usual relationship
2025-02-0796.2694.70-0.86SHW ahead
2025-02-0698.1795.93-0.65SHW ahead
2025-02-0598.7595.73-0.41near the usual relationship
2025-02-0498.2893.92+0.04near the usual relationship
2025-02-0398.0093.94-0.05near the usual relationship
2025-01-3199.3594.07+0.33near the usual relationship
2025-01-30100.8796.01+0.18near the usual relationship
2025-01-29100.0094.66+0.35near the usual relationship
2025-01-28101.0295.65+0.35near the usual relationship
2025-01-27102.5695.65+0.82LOW ahead
2025-01-24100.1894.59+0.44near the usual relationship
2025-01-2399.8494.85+0.26near the usual relationship
2025-01-2298.5793.96+0.15near the usual relationship
2025-01-21101.0094.95+0.58LOW ahead
2025-01-1799.7492.97+0.85LOW ahead
2025-01-1698.8793.02+0.56LOW ahead
2025-01-1598.0991.12+0.95LOW ahead
2025-01-1495.9789.73+0.75LOW ahead
2025-01-1395.0188.28+0.95LOW ahead
2025-01-1094.7286.72+1.41LOW ahead
2025-01-0894.3388.66+0.60LOW ahead
2025-01-0794.2187.83+0.86LOW ahead
2025-01-0695.4288.73+0.94LOW ahead
2025-01-0394.9488.39+0.91LOW ahead
2025-01-0294.3687.51+1.04LOW ahead
2024-12-3194.3089.28+0.39near the usual relationship
2024-12-3094.2788.97+0.50LOW ahead
2024-12-2794.8890.17+0.29near the usual relationship
2024-12-2695.3090.75+0.22near the usual relationship
2024-12-2495.6091.01+0.23near the usual relationship
2024-12-2394.5190.57+0.02near the usual relationship
2024-12-2094.6590.74+0.01near the usual relationship
2024-12-1993.4289.93-0.12near the usual relationship
2024-12-1895.4591.58-0.02near the usual relationship
2024-12-1798.4895.29-0.29near the usual relationship
2024-12-1699.3895.88-0.20near the usual relationship
2024-12-13100.2595.74+0.12near the usual relationship
2024-12-12100.6896.35+0.05near the usual relationship
2024-12-11102.3697.69+0.14near the usual relationship
2024-12-10103.2097.60+0.43near the usual relationship
2024-12-09104.7598.88+0.49near the usual relationship
2024-12-06104.47101.11-0.29near the usual relationship
2024-12-05103.19101.18-0.70SHW ahead
2024-12-04104.03102.98-1.01SHW ahead
2024-12-03104.84103.83-1.03SHW ahead
2024-12-02103.94103.90-1.33SHW ahead
2024-11-29104.09104.38-1.44SHW ahead
2024-11-27104.38103.47-1.09SHW ahead
2024-11-26104.87104.05-1.12SHW ahead
2024-11-25105.19104.99-1.32SHW ahead
2024-11-22101.13101.99-1.66SHW ahead
2024-11-21101.33100.68-1.20SHW ahead
2024-11-20100.5097.62-0.48near the usual relationship
2024-11-1999.0698.10-1.11SHW ahead
2024-11-18103.8498.59+0.23near the usual relationship
2024-11-15102.9399.54-0.36near the usual relationship
2024-11-14103.29102.03-1.03SHW ahead
2024-11-13104.05101.72-0.72SHW ahead
2024-11-12103.12100.77-0.71SHW ahead
2024-11-11104.88102.24-0.64SHW ahead
2024-11-08103.58101.56-0.82SHW ahead
2024-11-07101.75100.86-1.16SHW ahead
2024-11-06100.00100.00-1.44SHW ahead

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Oct 28, 2025 (LOW +0.2%, SHW +5.5%). Upcoming earnings: LOW Nov 18, 2026 (pre-market).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

1 simulated trade to Nov 3, 2026: -6.67% per trade on average after costs, 0 won.

LegsEnteredExitedWhyDaysBefore costsCosts + borrowAfter costs
Long LOW · Short SHWAug 9, 2023Nov 10, 2023divergence stop93-$638.01-$53.86-$666.97 (-6.67%)

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

LOW and SHW at a glance

LOW Lowe's Companies Inc.

Listing
NYSE · SEC CIK 60667
Industry
RETAIL: Building Materials · SIC 5211 Retail-Lumber & Other Building Materials Dealers
Market value
$119.7B
Price history
2,534 daily closes, Oct 12, 2016 to Nov 10, 2026

SHW The Sherwin-Williams Company

Listing
NYSE · SEC CIK 89800
Industry
RETAIL: Building Materials · SIC 5200 Retail-Building Materials, Hardware, Garden Supply
Market value
$82.4B
Price history
2,534 daily closes, Oct 12, 2016 to Nov 10, 2026

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
SHW / FASTWatchlistFAST by 1.29 sdSIC 5200 Retail-Building Materials, Hardware, Garden Supply
SHW / TSCOWatchlistSHW by 0.56 sdSIC 5200 Retail-Building Materials, Hardware, Garden Supply
HD / SHWWatchlistSHW by 0.48 sdRETAIL: Building Materials
HD / LOWWatchlistHD by 0.37 sdRETAIL: Building Materials

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.